
1
1451 Belcher Road South, Largo, FL 33773 • USA
• Tel +1 (727) 447-6140 • Fax (727) 442-5699 •
[email protected]F-5100 Inline Thermal Mass Flow Meter Manual 05/15 - 0686-11 / 18332 Page 21
4.5 START-UP & COMMISSIONING WORKSHEET
Please read all installation instructions carefully prior to proceeding with these steps. Use the
following worksheet for checking off the commissioning steps and recording measured values.
STEP TEST/MEASUREMENT S/N: S/N: S/N: S/N:
1. Meter location:
2. Conrm pipe size:
3. Conrm orientation:
4. Control system
programming:
5. Match display
serial number
(S/N) if ordered:
6. Signal connections
veried:
7. Supply voltage veried:
8. Connect power:
The following steps require ow in the pipe. Flow signal readings should be taken while
holding the ow rate constant, if possible. Otherwise, take the various output readings as
quickly as possilbe.
9. Analog or pulse
output(s)
4 - 20 mA signal:
Scaled output interval:
Calculated ow rate:
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
__________mA
____________
_______SCFM
10. Flow rate displayed by
control system: _______SCFM _______SCFM _______SCFM _______SCFM
Comentarios a estos manuales