4.2 COMMISSIONING
The last step in the installation process is commissioning the meter. Commissioning is a 2 step
process. The rst step is to review the mechanical installation to conrm that the ow sensor
and temperature sensor(s) are properly located in the piping system. The second step is a review
of the meter program settings. Both steps must be completed in order to nish the installation.
A simple commissioning checklist is shown below. A copy of this may be found online at www.
onicon.com/system-40/XXXX.
Commissioning Checklist
Part 1 Mechanical installation
Conrm that the ow sensor is properly located in the piping system (Sec. 3.1 & 3.2).
Conrm that the ow sensor is properly oriented with respect to ow direction (Sec. 3.2).
Conrm that the temperature sensor(s) is properly located in the piping system (Sec. 3.3).
Part 2 Programming
Conrm that the ow sensor location in the piping system (supply or return) is programmed into the meter
(Sec. 4.1 & 4.2.1).
Verify that the Units of Measure Settings in the meter are correct (Sec. 4.1 & 4.2.1).
Conrm that there are no alarm indications and the meter is functional (Sec. X.X).
4.2.1 Commissioning following initial power-up
During initial power-up, the following display pages will appear the commissioning option
is selected. The settings shown below allow the installer to set BACnet
®
parameters, the
ow sensor location (supply or return pipe) and the date and time. If the factory
pre-programmed engineering units for ow, energy and temperature are correct, press SAVE
to exit commissioning once the correct date has been set. Momentarily press NEXT if you
wish access the remaining commissioning mode display pages shown on the next page.